People
Customer centric, People First Policy
Headcount : 30 FTE
20 Engineers. Average experience of 10 years in the industry with Proven Track
Record
Commitment to people development and team alignment is vital to
achieve the
objectives and the ultimate goal.
Processes & Tools
Valve sizing selection software with ISA / IEC standards compliance.
Product design / PLM, FEA & CFD tools.
BOM Automation, GAD Automation
Milestone tracked Order Entry / Management, MRP, Inventory Planning, Vendor
Quality Management, PPC, Product Release etc in an Integrated ERP
platform.
Authentic QMS &
designs built by the team allows continuous improvement. All processes are fully
aligned
and implemented through in-house developed ERP software.
Plant & Equipment
Supply Chain
Stringent Vendor qualification requirements, onboarding and periodic
surveillance audit processes for vendor management embedded in the ERP suite.
Ability to cater customer specified special chemistry, and other NDT (MP,LP, RT, UT
etc) requirements along with secondary processing such as Hard Facing, NACE,
NORSOK (chemistry as well as coating) requirements etc.
Inspection & Testing
Diligent incoming inspection rigor using appropriate instruments such as PMI,
CMM, MSLD
Fully qualified personnel to carry out in-process inspection and certification
In house MP / LP testing capability by ASNT level II / III qualified personnel
Assembly & Testing capabilities
Adequately Equipped to meet with Assembly and Testing requirements as per IEC 60534-4, ISA 75.19.01, ANSI B16.34, API 598 for hydro test, seat leak tests etc as a standard.Optional tests like Fugitive Emissions test, Cryogenic tests etc can be performed as per applicable standards / customer specifications.
Our plant also houses a clean room with UV for assembly / testing of valves for O2 and other applications.
Space & Material Handling
Fully geared with material handling (up to 5 Tons) equipment, storage racks and
retrieval processes assisted by Bar code / RFID
Export packing as per ISPM 15 standards along with customer specified markings.
Shipping in compliance with international regulations as applicable.
Sufficient factory space of 6000 sq ft and a roof height of 10 Mts